Bear Creek & Eastern  

This page shows the progress made on this layout. Overall photos (upon which you can click) show what the layout was like on the date shown below it. The pages referenced by the links on the right contains photos and text of the detailed progress I made on that date. Near the bottom of each page there is a link to the next chronological entry, so you don't have to keep coming back to this page.


- February 4, 2006 -



- February 12, 2006 -



- March 2, 2006 -



- March 25, 2006 -



- August 20, 2006 -



- January 10, 2007 -



- July 23, 2007 -



- January 17, 2008 -



- March 6, 2008 -


Introduction
Trackplan
February 2006
4 Cutting spline for mainline
5 Starting spline for mainline
6 Mainline subroadbed completed
7 Mainline subroadbed risers
8 Laying mainline ties
12 Mainline ties completed
14 Mainline ballasted
27 Center backdrop installed
March 2006
2 Center front fascia installed
5 Support for bus wires
19 Wiring up the mainline
20 Installing turntable
25 Powering turntable
29 Turntable placed into service
June 2006
24 Center section scenic supports
July 2006
1 Center section scenic cover
19 More center section scenery
August 2006
19 First spur construction
22 Updated spur and center section
September 2006
26 Spur installed
January 2007
22 Bear Creek industrial area started
February 2007 (one-year anniversary)
13 Industrial area track plan
18 Woods Furniture Factory installed
25 Laying ties in B.C. industrial area
28 Industrial area Tortoise installation
March 2007
14 Industrial area tie laying done
25 Industrial area track started
June 2007
4 Industrial area scenery started
14 Dressing up the layout
24 Bear Creek scenery base complete
30 Bear Creek front fascia complete
July 2007
30 Installing a programming track
October 2007
7 Dealing with the upramp
20 Completed industrial area trackwork
November 2007
4 Painting backdrop
December 2007
13 Trees are growing
January 2008
17 More trees and layout expansion
22 Some remodeling work is necessary
25 New benchwork continues
February 2008 (two-year anniversary)
7 Building the subroadbed for center section
13 Starting right-hand section benchwork
15 Subroadbed construction on right-hand side
26 Spline subroadbed construction completed
March 2008
2 Installing cork on the subroadbed
6 Finished installing the subroadbed cork
13 Installing some flextrack
22 Preparing to lay ties
31 Ties are down (special anniversary)
April 2008
11 Completing the ties
27 Finished ballasting
May 2008
1 Installing Tortoise
July 2008
15 The End