Furniture Factory  

This page documents my attempt at creating a furniture factory diorama. The latest overall photos of the diorama's structures are shown here. Construction progress is fully documented on the pages listed below. The dates indicate the last time the page was updated with new content. click on images here for a larger view -->

Main Factory Building (October 19, 2006 - December 18, 2006)
1.  Base and Wall Construction Nov. 7, 2006
2.  Creating Door Openings Nov. 1, 2006
3.  Creating Floors and Roof Nov. 1, 2006
4.  Painting Exterior Walls Nov. 6, 2006
5.  Installing Glass Nov. 6, 2006
6.  Lower-level Interior Nov. 9, 2006
7.  Remaining Interior and Lights Nov. 15, 2006
8.  The Roof Nov. 18, 2006
9.  Loading Platform Dec. 18, 2006
Lumber Storage Shed (December 19, 2006 - January 20, 2007)
10.  Structure Design Dec. 19, 2006
11.  Base Platform Dec. 23, 2006
12.  Side Walls Jan. 8, 2007
13.  Interior Racks Jan. 12, 2007
14.  Rear Wall Jan. 14, 2007
15.  Lumber Jan. 15, 2007
16.  Walkway Jan. 18, 2007
17.  The Roof Jan. 20, 2007
Diorama (January 28, 2007 - February 18, 2007)
18.  Ground Cover Jan. 28, 2007
19.  Fence Jan. 31, 2007
20.  Grasses & Bushes Feb. 13, 2007
21.  Vehicles Feb. 18, 2007






Copyright © 2004-7 Peter Vanvliet